T- Codes – Creating and Editing Project Structures

January 6, 2008

Transaction Description CJ20N Project Builder: Create, Change, and Display Projects CJ01 Create Project CJ02 Change Project CJ03 Display Project CJ91 Create a Project Template CJ92 Change a Project Template CJ93 Display a Project Template CNMASS Mass Change of Project Structure Powered by ScribeFire.

Read the full article →

Results Analysis (RA)

January 6, 2008

Overview: The objective for calculating Work in Process (WIP) is to determine the value of manufacturing activity in process at the end of a fiscal period, during a fiscal period and to properly reflect this value on the financial statements. WIP calculation is a facet of Results Analysis (RA). RA is a specialized tool within …

Read the full article →

GPD – Grouping, Pegging and Distribution

January 2, 2008

Grouping Pegging Distribution GPD is highly connected to SAP Project Systems. it includes the following capabilities: Grouping, which allows manufacturers to group requirements originating from different WBS elements or projects. Pegging, which makes it possible to keep track of the origin of the demand Distribution, which distributes the actual costs and commitments back to the …

Read the full article →

Issues to Determine for Webinar

December 31, 2007

Objectives Agenda PBL overview in the A&D industry (How A&D is moving towards Performance Based Logistics) How PBL requires specific costing, enabled by PS, to allocate costs to specific PBL contracts Setting up PBL Contracts as Projects in PS Explain WBS Contracts Network Activities MRP PBL Flow in SAP Demo Steps Setup a project in …

Read the full article →

PS Initial Configuration

December 22, 2007

Project Builder (CJ20N) can be used to create and modify project structures. The project structure includes the Structure Tree in the upper left. This displays the project definition, WBS elements, network headers, activities, activity elements, milestones, PS texts, documents and assigned material components of a project. The Templates are in the lower left pane. Objects …

Read the full article →

Networks in PS

December 22, 2007

Networks can be used to map the flow of different project activities as activities and relationships in the system. Networks allow you to use logistic integrations with materials management, production, plant maintenance, purchasing, capacity requirements planning and time scheduling. Networks have one responsible person called an MRP controller. Networks are made up of activities. Technically …

Read the full article →